Technical Description:
The whole installation (Model: E.V.A.) for sale includes components
listed below:
STEAM BOILER
Manufacturer: Wehrle Werk
Year: 1999,
Heating capacity: up to 10 MW
Fuel type: biomass/RDF
Fuel gas volume: 20.000 Nm³/h
Fuel consumption: approx. 2500 kg/h
Fuel need: approx. 20 000 t/a
Average combustion temperature: approx. 900°C
Main steam pressure: water steam with 40 bar
Main steam temperature: 410°C
Main steam mass flow: 11 t/h
Combustion power gross: max. 10.000 kW
Combustion power gross: min. 7000 kW
Water content: 25 m³
STEAM TURBINE
Manufacturer: KKK / Siemens SST110
Electrical capacity: up to 2 MW
Year: 1999, serial number 4.746.114
Type: TWIN steam turbine used as condensation machine AFA4 / AFA6 GTA
electrohydr.
Turbine control (Kuhse with Siemens S5), AFA 4: drive speed: 1500
1/min, rapidlocking
Speed min: 1678 1/min,
Speed max: 1712 1/min
Gear ratio: 11.96:1
Live steam pressure: min. 31 bar – max. 47 bar
Live steam temperature: min. 350°C – max. 428°C
Waste steam pressure: min. 0.50 bar – max. 2.50 bar, in operation
1.50 bar
Waste steam temperature: 347°C; AFA 6: drive speed 1500 1/min
AND ALL OTHER COMPONENTS NECESSARY TO BUILD THE COMPLETE POWER
PLANT!
Such as:
- Sterling water feed pumps
- Boiler water system from Hager & Elsässer with softening
installation and reverse osmosis unit
- Horizontal superheater
- Economizers
- Reduction station
- Cooling station
- Water treatment plant
- Fuel feeding system
- Air protection devices with bag filters
- Chimney 33 m high – located inside the boiler room (above the roof
of 17 m), which discharges exhaust gases and auxiliary facilities,
mainly connected with fuel storage
- And many others
Ready to build in a new location NOW!
Available now!
The installation was built in Germany, where it worked on RDF fuel.
Then, sold and transported to Poland (current location).
Find more here - /
Contact us at -